Saudi Vision 2030 — Independent Intelligence, Analysis & Investment Research
21,000 Dead: The Worker Death Toll Behind Saudi Vision 2030
21,000 workers from India, Bangladesh, and Nepal dead since 2017. 100,000 missing. 80% of deaths classified as 'natural causes' without autopsy. The forensic account of the labour catastrophe behind Saudi Arabia's national transformation.
Abdul Wali Skandar Khan: The First Documented Death on a NEOM Construction Site
A 25-year-old Pakistani engineer died when a guardrail collapsed at NEOM. No investigation. No compensation. His brother flew to Saudi Arabia to retrieve the body. The first formally documented worker death on a NEOM construction site.
FIFA 2034: How Football's Governing Body Sold a World Cup to a Forced Labour Economy
A forced labour complaint at the ILO. A letter from Human Rights Watch that FIFA never answered. An 'independent' assessment that consulted no workers. And a World Cup stadium planned on a structure built by trapped migrant labourers.
Jeddah Tower: Seven Years Frozen at One-Third
The world's first kilometre-tall building was halted in 2018 when its backer was arrested in the Ritz-Carlton purge. Seven years of frozen concrete. Now past the 95th floor. The full chronology of the most interrupted supertall in construction history.
Latest Intelligence
21,000 Dead: The Worker Death Toll Behind Saudi Vision 2030
21,000 workers from India, Bangladesh, and Nepal dead since 2017. 100,000 missing. 80% of deaths classified as 'natural causes' without autopsy. The forensic account of the labour catastrophe behind Saudi Arabia's national transformation.
Abdul Wali Skandar Khan: The First Documented Death on a NEOM Construction Site
A 25-year-old Pakistani engineer died when a guardrail collapsed at NEOM. No investigation. No compensation. His brother flew to Saudi Arabia to retrieve the body. The first formally documented worker death on a NEOM construction site.
FIFA 2034: How Football's Governing Body Sold a World Cup to a Forced Labour Economy
A forced labour complaint at the ILO. A letter from Human Rights Watch that FIFA never answered. An 'independent' assessment that consulted no workers. And a World Cup stadium planned on a structure built by trapped migrant labourers.
Jeddah Tower: Seven Years Frozen at One-Third
The world's first kilometre-tall building was halted in 2018 when its backer was arrested in the Ritz-Carlton purge. Seven years of frozen concrete. Now past the 95th floor. The full chronology of the most interrupted supertall in construction history.
Lucid Motors: The $15 Billion Hole in Saudi Arabia's Post-Oil Strategy
PIF invested over $9 billion in Lucid Motors. Accumulated deficit: $15.6 billion. Share price down 95%. 14 executives departed in two years. Deliveries at 10% of projections. The forensic record of the most expensive sovereign wealth fund bet in EV history.